Dear Mr Ghods,

Thank you, but there is still a need for further clarification in order to accept the request:
- the topics are too wide and general and such knowledge and experience should be available in Iran (research/TS organizations and universities) and in Russia as well
- what are the expectations: to address basis knowledge/experience/expertise on this topics or in more detailed and specific issues and how to cover them in one week WS/EM?

Best regards,
B. Gueorguiev

-----Original Message-----
From: ghods@nppd.co.ir [mailto:ghods@nppd.co.ir]
Sent: Wednesday, 22 April 2015 15:50
To: GUEORGUIEV, Boris
Cc: sheikholeslami; rahnama; talebi
Subject: Re: IRA2014001 project design

Dear Mr. B.Gueorguiev

In response to Your email, please be informed that the following issues are requested to be addressed in within implementation of task “ WS on Stress and strength analysis of the main equipment of BNPP-1 “:

-Mechanical and thermal low/high cycle fatigue analysis -Seismic strength analysis of main equipment -Flow induced vibration analysis of reactor internals -Thermal stratification analysis of PRZ surge line and feed water line -Probability Fracture Analysis -Stress and strength analysis of welding -Analysis of effects of loose parts in primary circuits of NPP -Hydrodynamic and vibrational strength analysis of rotary equipment of NPP including RCP

Best Regards
M.Ghods

----- پیام اصلی -----
از: "B Gueorguiev"
به: Ghods@nppd.co.ir
Cc: sheikholeslami@nppd.co.ir
فرستاده شد: چهارشنبه 2 اردیبهشت 1394, 4:21:41 ب.ظ GMT +03:30 Tehran
عنوان: IRA2014001 project design

Dear Mr Ghods,

Please provide urgently clarification on the planned activity 3.9 on "Stress and strength analysis of the main equipment of BNPP-1", including the need, objective main focus, etc.) and stress calculations availability.

Regards,
B.Gueorguiev

This email message is intended only for the use of the named recipient. Information contained in this email message and its attachments may be privileged, confidential and protected from disclosure. If you are not the intended recipient, please do not read, copy, use or disclose this communication to others. Also please notify the sender by replying to this message and then delete it from your system.
This email message is intended only for the use of the named recipient. Information contained in this email message and its attachments may be privileged, confidential and protected from disclosure. If you are not the intended recipient, please do not read, copy, use or disclose this communication to others. Also please notify the sender by replying to this message and then delete it from your system.

Black Reward

Disclaimer: We have scanned all emails before publishing them in the public domain, but please be careful when you open emails' attachments. It is recommended to open them in a sandbox.