THIS IS A DRILL – THIS IS NOT A REAL EVENT – THIS IS A DRILL

NO ACTION REQUIRED


Event Notification Report – Plant name Narora

Notification 3 – Date: 24-12-2018

Plant name:

Narora

Plant owner:

NPCIL

Unit(s) affected:

Unit 1

Reactor type(s):

PHWR

Event date:

24.12.2018

Event time (UTC/local time):

09:00/14:30

What happened:

9:00 UTC Loss of off-site power resulted in reactor trip on “No Primary Coolant Pump running on either bank” due to 6.6 KV class IV electric supply failure signal. None of the EDGs came on line to provide emergency electric supply.
Emergency Alert was declared .

9:06 UTC Crash cool down (cooling of primary circuit by steam blowing from secondary circuit)

9: 15 UTC Plant emergency declared for unit 1 as make-up to Steam Generators failed. Firewater injection to Steam Generators was not successful through design route. Fire water injection MOV to SGs (secondary side) did not open. Then fire water injection to SGs through external hook-up points was started but injection line flange at its upstream valve started leaking very badly.

Primary Heat coolant temperature and pressure increased.

The relief valve of Primary Heat Transport system was automatically actuated. SG relief valves had been already actuated during the Primary Heat Transport system crash cool down mode as per station emergency operating procedure .

9:45 UTC Site Emergency was declared .

10:10 UTC Narora Unit 2 was manually shutdown as per station procedure

Radiological Safety Officer (RSO) starts survey of plant and site areas. Operation staff working fields shifted to MCR. Radiological survey in the site areas has revealed ground level release and prophylaxis administration to station staffs is ordered.

10:30 UTC Prophylaxis administration to station staff is completed. Site evacuation of non-essential station staff was ordered.

11: 25 UTC Site evacuation completed

11:30 UTC EDGs made available, Class III power supply 6.6 KV restored. Moderator circulation started. Reactor core cooling restored by operation of Shutdown cooling pumps.

11:30 UTC Site emergency terminated .

11:35 UTC Plant emergency in unit 1 terminated .

Reactor status:

subcritical

Consequence(s) of the event:

Due to loss of off-site power and emergency power supply the core cooling is degraded. Primary system was not breached.

Event classification:

Site emergency

Why this event notification?

You are receiving this event notification report because you are a WANO member and are on the WANO event notification distribution list. This report is classified as Limited Distribution.

Confidentiality notice

Copyright © 2018 World Association of Nuclear Operators (WANO). All rights reserved. Not for sale or commercial use. This document is protected as an unpublished work under the copyright laws of all countries which are signatories to the Berne Convention and the Universal Copyright Convention. Unauthorised reproduction is a violation of applicable law. Translations are permitted. This document and its contents are confidential and shall be treated in strictest confidence. In particular, except with the prior written consent of the WANO Chief Executive Officer, this document shall not be transferred or delivered to any third party and its contents shall not be disclosed to any third party or made public, unless such information comes into the public domain otherwise than in consequence of a breach of these obligations.

THIS IS A DRILL – THIS IS NOT A REAL EVENT – THIS IS A DRILL

NO ACTION REQUIRED

DISCLAIMER: This e-mail and any of its attachments may contain proprietary WANO information that is privileged, confidential, or protected by copyright belonging to WANO. This e-mail is intended solely for the use of the individual or entity for which it is intended. If you are not the intended recipient of this e-mail, any dissemination, distribution, copying, or action taken in relation to the contents of and attachments to this e-mail is contrary to the rights of WANO and is prohibited. If you are not the intended recipient of this e-mail, please notify the sender immediately by return e-mail and permanently delete the original and any copy or printout of this e-mail and any attachments. For information on how WANO handles personal information, please see our Privacy Statement .
Company Information: World Association of Nuclear Operators (WANO) Registered in England & Wales No 2383396 – Established in 1989 – Limited by Guarantee – Registered office: WANO London, Level 35, 25 Canada Square, Canary Wharf, London, E14 5LQ, United Kingdom.

--
Sincerely Yours
Rasoul Mahmoudi
Manager of Managing Director Office,
Public Relations & International Affairs

Add: Nuclear Power Plant, Bushehr, Iran
P.O.Box: 75181/111
Tel: +98 77 3111 2585
Fax: +98 77 3111 2710
Personal Email: Mahmoudi@nppd.co.ir

Black Reward

Disclaimer: We have scanned all emails before publishing them in the public domain, but please be careful when you open emails' attachments. It is recommended to open them in a sandbox.